TIM dispensing system commissioning for production ramp
Client
U.S.-based clean-energy manufacturer scaling production output.
Challenge
New thermal-interface-material dispensing equipment required on-site commissioning, parameter optimization, and integration with existing production workflow.
IM role
Equipment procurement, delivery coordination, on-site installation, dispensing parameter calibration, and production validation.
Outcome
Dispensing system commissioned to production spec within 2 weeks of equipment arrival. Achieved 99%+ dispense accuracy on thermal-interface-material application. Active service agreement for quarterly calibration and preventive maintenance.